ClickCease
Water Treatment Company Muskegon, MI

Your DI Headquarters

Industry News
RO System in Grand Rapids

Protect Your Business from PFAS Chemicals

Per- and Polyfluoroalkyl Substances (PFAS) chemicals were developed in the 1940s, and have been used in the production of commercial, industrial, and consumer products such as non-stick cookware, water-resistant fabrics, fire-fighting foams, and grease-proof food packaging. In 2002, companies...
Industry News

What is a Grow Op?

Before we delve into the specifics of planning a grow operation, it is important to establish an understanding of what a growing op actually is. According to Google, a grow operation is an enterprise or facility engaged in the...
Industry News
High Purity Water

DI Water Market Research

A recent study was done by Future Market Insights on the global market for deionized water systems. FMI is a leading market intelligence and consulting firm. Their report includes a global industry analysis and opportunity assessment for deionized water...
Water Treatment Tips

Water Usage Tips for Small Businesses

At Besco Water Treatment, we understand that effective water practices help keep small businesses productive. The availability of purified water for drinking, cleaning, hygiene and other common workplace uses is essential to maintaining company standards, where every opportunity for...

Free Consultations

Featured Case Study

Client: State of Michigan, Women's Huron Valley Correctional Facility, Pittsfield Township, Michigan

Huron Valley Correctional Facility Water Softener System
Client Challenge: Security. Speed. Limited Downtime. Those were the keys to this project for the State at Huron Valley. The actual installation was that of a water softener system for a boiler at the prison. The agency required background checks on all Besco employees. In addition, all Besco workers had to adhere to stringent security requirements dictated by the prison environment. Besco Solution: Besco has deep experience with this type of installation so the added security and time requirements could be met while ensuring that the State would be pleased with the installation. So Besco engineered, sold and removed the existing equipment, and then installed the replacement equipment. This new water softener system was completely installed, and was up and running all in one day, due to the meticulous coordination efforts of the Besco Team. Photos were taken prior to the installation so that all materials were present at the time of installation. An environmental extraction company was scheduled to have the old materials removed and taken away enabling Besco’s team to have the existing system removed and off-site within two hours. The technicians then went to work installing the new system. It was all accomplished by 3:30PM…fully functioning and operational. The coordination and installation of a system this size typically requires a minimum of two days to complete, we did it in one. Besco Commercial Water Treatment can keep a timeline and, because of the volume of systems that we’ve engineered, we know how to do it efficiently and with limited downtime for our customers.
Check out the rest of our Case Studies!

What Do Our Customers Say?

Previous Next